Forum: Revisions

Answered

Multiple phases

Posted on: 23 Apr, 2013

Is there an option to have multiple phases going at the same time? For instance, we normally have the building consent phase and the tender phase going at the same time and would like to know if this is possible?
Answered

I cant move or delete the Cadimage Revision objects in a layout? Seem locked

Posted on: 09 Jan, 2013

Happy New Year team Can you please tell me why a Revisions object would be greyed out and impossible to delete? I placed a couple more and now they are permanently in the file. What would cause this please? As you can see they are not on a locked layer. Ive tried changing the layer settings to no avail Regards
Answered

Entering more than 250 characters in a Revision causing issues

Posted on: 09 Jan, 2013

Hi there After the initial issues in V16 we are now using the latest version of revisions. I think we may have found a problem with it. We are using the revision description as our notes for the revision. It seems by inputting over a certain number of characters within this textbox causes issues? We enter all the revisions under one field, but at a certain point it gets cut off in the Revision table. When we reduce the number of characters (somewhere around 200-250) in the description everything seems to work fine again? Hope to see a fix soon
Answered

Lost all my revisions when migrating to V16?

Posted on: 09 Aug, 2012

Dear Support Team I have migrated a project from V15 to V16 but I noticed that none of my revisions are there, the only option I have is to initialize which I had already done in V15. I understand that it removes all of the revision data if re-initialize. Is there a way to get my revision data back? Thank you
Answered

Revisions have dissapeared & now greyed out?

Posted on: 19 Jun, 2012

I made changes to drawings. Gone to Revision Manager to add revision & found that earlier revision references have gone from all of the layouts, and the last revision (Tender Issue) has gone from the Revision Manager. When I hit the last revision (Tender Info) showing in Revision Manager the layouts that it referered to are shown ticked but greyed out (see screen shot). How do I resurrect the Tender Info revision so that it shows on the layouts, and do I just go back thru the process & redo the revision that has gone from the Revision Manager. What will have caused this
Answered

I cant get Revisions to work in teamwork

Posted on: 18 Jun, 2012

Hi there Trying to use Revision Manager on a project, yet each time we try to apply it we get the message Autosave has been suspended, and the Teamwork function essentially collapses. See attached screenshot. Any ideas? Cheers
Answered

How can I show which paper size was sent in Revisions Manager?

Posted on: 18 Jun, 2012

Hi their - on the document transmittal how do I indicate that i sent a client 1xA1 and 3 A3's of a certain drawing?... it seems I can only say what types of size I gave but not how many of each. Also how customisable is the 'look' of the transmital beyond line weights?... cheers
Answered

How can we extend the Revision Manager for more entries?

Posted on: 18 Jun, 2012

As you can see we have completely maxed out the history box on one of our drawings. We don't want to expand the history box as this will effect other drawings that only contain 1 or 2 revisions.
Answered

Can we rename the ArchiCAD - master only layer?

Posted on: 18 Jun, 2012

Hi, we are developing a new layer scheme that groups layers into categories of similar items. One category is LAYOUT. I would like to group the Cadimage ArchiCAD - master only layer with the other layout related layers. Is there any mechanism for renaming it? Thanks. Cheers
Answered

How do I get the layouts to number consecutively?

Posted on: 18 Jun, 2012

When listing layouts in the transmittal how do I get the layouts to number consecutively, at present I Have A01, A11, A12, A02, A03